Finite-capacity multi-class production scheduling with set-up times

Eungab Kim, Mark P. Van Oyen

Research output: Contribution to journalArticlepeer-review

1 Scopus citations

Abstract

We treat the scheduling of a single server in a finite-buffer capacity, multi-class, make-to-order production system subject to inventory holding costs, set-up times, and customer rejection costs. We employ theoretical and numerical analysis of a Markov decision process model to investigate the structure of optimal policies and the performance of heuristic policies. We establish the monotonicity of optimal performance with respect to the system parameters. Based on our insights, we provide a heuristic policy called the Capacitated Modified Index Rule (CMIR) for capacitated scheduling with customer loss penalties. The CMIR heuristic can easily be precomputed and stored for real-time control. Numerical benchmarking with respect to the optimal performance as well as an existing heuristic suggests that CMIR is very effective.

Original languageEnglish
Pages (from-to)807-818
Number of pages12
JournalIIE Transactions (Institute of Industrial Engineers)
Volume32
Issue number9
DOIs
StatePublished - Sep 2000

Fingerprint

Dive into the research topics of 'Finite-capacity multi-class production scheduling with set-up times'. Together they form a unique fingerprint.

Cite this