Development and Application of Off-Site Construction Project Management System-Focusing on PC Construction-

Yeeun Jang, Jae Man Lee, Jeongwook Son

Research output: Contribution to journalArticlepeer-review

Abstract

This study presents the development process and application effect of project management system to efficiently manage OSC projects which are recently getting more attention. We conducted literature review, case analysis, and expert interviews to identify the characteristics of the OSC project management and to derive the requirements and necessary functions that the management system should have. Based on the results of the preliminary study, the OSC project management system was implemented and the effect was analyzed by applying it to the field. It was found that the management system improved the efficiency and accuracy of management work and reduced unnecessary time and effort at each stage of factory production, transportation, and on-site installation. This study is meaningful in that it identified the characteristics of OSC project management, derived the requirements and necessary functions of OSC project management system, and presented practical applicability by developing management system and analyzing the application effect.

Original languageEnglish
Pages (from-to)281-291
Number of pages11
JournalJournal of the Architectural Institute of Korea
Volume38
Issue number8
DOIs
StatePublished - 1 Aug 2022

Bibliographical note

Publisher Copyright:
© 2022 Architectural Institute of Korea.

Keywords

  • Construction Management
  • Management System
  • Off-Site Construction
  • Supply Chain Management

Fingerprint

Dive into the research topics of 'Development and Application of Off-Site Construction Project Management System-Focusing on PC Construction-'. Together they form a unique fingerprint.

Cite this