N2 - This study presents the development process and application effect of project management system to efficiently manage OSC projects which are recently getting more attention. We conducted literature review, case analysis, and expert interviews to identify the characteristics of the OSC project management and to derive the requirements and necessary functions that the management system should have. Based on the results of the preliminary study, the OSC project management system was implemented and the effect was analyzed by applying it to the field. It was found that the management system improved the efficiency and accuracy of management work and reduced unnecessary time and effort at each stage of factory production, transportation, and on-site installation. This study is meaningful in that it identified the characteristics of OSC project management, derived the requirements and necessary functions of OSC project management system, and presented practical applicability by developing management system and analyzing the application effect.
AB - This study presents the development process and application effect of project management system to efficiently manage OSC projects which are recently getting more attention. We conducted literature review, case analysis, and expert interviews to identify the characteristics of the OSC project management and to derive the requirements and necessary functions that the management system should have. Based on the results of the preliminary study, the OSC project management system was implemented and the effect was analyzed by applying it to the field. It was found that the management system improved the efficiency and accuracy of management work and reduced unnecessary time and effort at each stage of factory production, transportation, and on-site installation. This study is meaningful in that it identified the characteristics of OSC project management, derived the requirements and necessary functions of OSC project management system, and presented practical applicability by developing management system and analyzing the application effect.
KW - Construction Management
KW - Management System
KW - Off-Site Construction
KW - Supply Chain Management
UR - http://www.scopus.com/inward/record.url?scp=85138213243&partnerID=8YFLogxK
U2 - 10.5659/JAIK.2022.38.8.281
DO - 10.5659/JAIK.2022.38.8.281
M3 - Article
AN - SCOPUS:85138213243
SN - 2733-6239
VL - 38
SP - 281
EP - 291
JO - Journal of the Architectural Institute of Korea
JF - Journal of the Architectural Institute of Korea
IS - 8